Total Quality Logistics Building

Our Work

Total Quality Logistics - Building 3
Total Quality Logistics Building 3
  • 160,000 sf. 3 story office building
  • Water source heat pumps with boiler, cooling tower, sheet metal, and plumbing.
Atlas Air
Atlas Air
  • 65,000 sf. 2 story office building (design build)
  • Water source heat pumps with boiler, fluid cooler, sheet metal, controls, and plumbing.
Premier Health Vandalia MOB
Premier Health Vandalia MOB
  • 45,000 sf 2 story medical office building
  • Package rooftop variable air volume (VAV) air handling units, sheet metal, controls, medical gas, and plumbing.
Tri-Health Finneytown MOB
Tri-Health Finneytown MOB
  • 58,000 sf. 2 story medical office building
  • Package rooftop variable air volume (VAV) air handling units, sheet metal, controls, and plumbing.
Project Condor - Amazon
Project Condor - Amazon
  • 2.4 m, sf. Plus 4 stories of mezzanine. Distribution
  • Fully condition warehouse, sheet metal, controls, and plumbing
DHL Distribution Center
DHL Distribution Center
  • 306,000 sf. Distribution
  • Make-up air units, summer ventilation, package rooftop units, sheet metal, controls, and plumbing.
Warren County Courts
Warren County Courts
  • 27,000 sf. Court House
  • Package rooftop variable air volume (VAV) air handling units, sheet metal, and plumbing.
Paycor Data Facility
Paycor Data Facility
  • 4 story, 125,000 Sq. Ft. WSHP with (2) fluid coolers and (2) DOAS with heat recovery wheels
  • Data room had a floor mounted CRAC unit tied into the building loop. Data Center was 446 Sq Ft with Ceiling Distribution.
Anthem Data Room
Anthem Data Room
  • Anthem Data Room had floor mounted CRAC units with condensing units on the roof.
  • Data center was 648 sq ft with floor distribution.